Seven mines, operating within BiH Power Company “Elektroprivreda BiH” group, decreased operating loss last year by 49.8 million KM.
The total loss in 2015 amounted to 107.6 million KM, and last year it was reduced to 57.7 million KM.
Four of the five mines, Kreka, Djurdjevik, Abid Lolic and Gracanica, operated in the black. These are preliminary data, and the power company expects that the loss in mine operations by the end of the month could also be lower, because they are still waiting for the final results of some mines.
“We expect the loss to be less than 50 million KM compared to 2015,” BiH Power Company said.